PUE values are only comparable if they were generated in the same way. Check every value stated by a provider or a tender in this order:
- Clarify the period: an annual value from operations is comparable, a monthly or instantaneous value is not.
- Clarify the measurement points of the IT energy: if they are at different distances from the devices, part of the difference between two values is a matter of measurement.
- Clarify whether the value is measured or calculated: a design value does not belong next to an operational value.
- Clarify utilisation and climate: a fully occupied location in the north and a half-occupied one in the south differ without one being built worse.
- Put WUE and electricity procurement next to it: only together do the three figures show the energy demand, origin of the electricity and water consumption of a location.
We did not build the data centres in which the ENTRONYX platform runs; we select them based on energy efficiency, legal framework and connectivity. A location is only considered if the cooling is based on indirect free cooling, adiabatically supported: outside air cools a closed water circuit via dry coolers, and mechanical cooling only runs when the outside temperature is no longer sufficient for this. The other requirements, from closed cold aisle containment to power supply, are listed on the Data centres page.
Overhead consumption per kWh of IT energy = (PUE − 1) × 1,000 Wh
PUE per location where the platform runs| Location | Country | PUE | Overhead consumption per kWh of IT energy |
|---|
| Frankfurt am Main | Germany | 1.14 | 140 Wh |
|---|
| Düsseldorf | Germany | 1.12, provisional | 120 Wh |
|---|
| Helsinki | Finland | 1.08 | 80 Wh |
|---|
The values for Frankfurt am Main and Helsinki are annual averages from operations; for Düsseldorf the value is provisional because an annual evaluation is not yet available. This overview does not show the measurement points of the IT energy.
We select based on energy efficiency; the best value in our portfolio is 1.08 in Helsinki, the highest is 1.14 in Frankfurt am Main. For every 1,000 kWh of IT energy, the difference in overhead consumption is therefore 60 kWh. Latency, electricity procurement, connectivity and certificates per location are listed under All locations.
Rule of thumb
A PUE value is only a comparable figure with the period, measurement points and utilisation. If one of the three is missing, you are comparing numbers, not locations.