For the SAP stack, 3 of the four recovery levels are approved; Pilot Light is not — a single provisioned host does not carry an approved configuration. Levels, RPO (the maximum acceptable data loss, as a time span), RTO (the time until restart) and cost model can be found at disaster recovery.
Limit of synchronous metro mirroring: Only available between fra1 and fra2. Every write operation costs around 0.3 ms extra, and logical errors are mirrored synchronously — this tier does not replace a backup, it complements it.